Connect with us

Metro

Rehabilitation works on failed portions of Third Mainland Bridge commence tomorrow – LASG

The Lagos State Government says rehabilitation work will be carried out on the Third Mainland Bridge on Sunday (tomorrow) to repair identified failed/peeled asphaltic sections.

Published

on

Third Mainland Bridge

The Lagos State Government says rehabilitation work will be carried out on the Third Mainland Bridge on Sunday (tomorrow) to repair identified failed/peeled asphaltic sections.

The state Commissioner for Transportation, Dr. Frederic Oladeinde, in a statement on Saturday, disclosed traffic diversion plans for the rehabilitation process of the bridge occurring between 9 am and 4 pm.

Citing the readiness of the Lagos State Public Works Corporation to carry out the project, Oladeinde explained that traffic would be diverted from one lane to another lane at the identified failed asphaltic sections on the bridge.

He added that this was expedient to solve tailbacks along the bridge at the peak periods as a result of the failed sections.

Oladeinde assured Lagosians that the Lagos State Traffic Management Authority (LASTMA) would be “fully” on the ground to direct traffic to ameliorate the inconveniences.

The statement further implored motorists to be patient as the measures taken are aimed at providing quality and safe road infrastructure for everyone.

 And For More Nigerian News Visit GWG.NG